General and MEP contractors
GCs, construction managers at risk, and the electrical and mechanical firms that carry most of the value on a technical building.
- Clients
- General contractors and CMs at risk; design-build firms; electrical and mechanical contractors
- Contracts
- CM at risk with a GMP, design-build, negotiated cost plus on repeat programs, lump sum on public healthcare
- Markets
- All six US metros. Dublin and West London
Building types
Mission critical work first. Then life sciences labs and manufacturing plants. Then hospitals and outpatient centers. The same firms often build all three, with separate business units competing for the same superintendents.
On life sciences jobs commissioning runs on into qualification and validation, and the turnover package has to survive a quality audit. In healthcare, a lot of the work happens inside hospitals that stay open, under infection control risk assessments and shutdowns planned to the hour.
Typical roles
- VP Operations
- Project Director
- Senior Project Manager
- Construction Manager
- General Superintendent
- Electrical Superintendent
- Mechanical Superintendent
- Preconstruction Director
- Estimating Lead, MEP
- MEP Director
- Project Controls Director
- Quality Manager
- Business Development Director
A strong contractor resume
- Delivered a GMP job and can explain where the contingency went, line by line.
- For Preconstruction Directors, priced MEP packages from real quantities and planned long-lead procurement into the bid. Lead times on switchgear and large transformers have run past a year in recent years, and a precon lead who plans around that earns their salary twice.
- For VP Operations, carried a book of concurrent projects, set staffing across them, and turned round at least one job that was losing money.
- For superintendents, led electrical or mechanical rough-in through energization and dealt directly with the utility's field crews.
- Moved from a subcontractor to a GC, or the other way, and can describe what changed in how they handled risk.
Backlog decides moves
Contractor leaders move for the next project. A Project Director with good backlog at their current firm is hard to shift. One whose job finishes in four months is easy to talk to. We keep track of those dates.
Non-compete and non-solicit clauses vary by state and by contract. Read them early. A surprise in week ten can stall an offer for a month.