Role directory
The seats we recruit, grouped by what the person does all day.
The last column is the part of a career we look at hardest in screening. If your seat is not here, ask anyway: shannon@maulegrouphq.com.
Executive and operations
| Role | Usually sits with | Scope | What we test for |
|---|---|---|---|
| VP Operations | GC or MEP contractor | Delivery across a region or business unit: staffing, margin, client relationships | Whether they have fixed a losing job, and how they decide who runs what |
| Regional Director or General Manager | Contractor opening or running a regional office | Profit and loss, pursuits, hiring the first team | Whether they built an office from a handful of people or inherited one |
| VP Design and Construction | Owner or developer | The capital program, design standards, procurement strategy, GC selection | Running several GCs at once and holding them to one standard |
| Director of Mission Critical | Contractor business unit | A mission critical book of work, from pursuit to warranty | Repeat clients, and what those clients would say |
Program and project delivery
| Role | Usually sits with | Scope | What we test for |
|---|---|---|---|
| Program Director | Owner, developer or GC | Several buildings or sites, governance, equipment and utility interfaces | Portfolio thinking: standards, sequencing, procurement across phases |
| Project Director | GC or owner | One building, phase or campus from award to turnover | Stayed to turnover, more than once |
| Senior Project Manager | GC, MEP contractor or consultancy | A project or a large package, with direct client contact | Commercial control: change orders, cost to complete |
| Construction Manager | GC | Running the site day to day: trade sequencing, safety, deliveries | Size of site run, and how they got through the busiest month |
| Owner's Representative | Owner, or a consultancy acting for one | Acts for the owner on a live contract, every day of it | Can read a GC's schedule and push back with evidence |
MEP and engineering
| Role | Usually sits with | Scope | What we test for |
|---|---|---|---|
| MEP Director | GC, MEP contractor or developer | MEP strategy across bids and projects, design coordination, packages | Real depth in both electrical and mechanical |
| Electrical Project Manager | Electrical contractor or GC | MV and LV distribution, gear procurement, energization | What gear they bought, when it was ordered, and what went wrong |
| Mechanical Project Manager | Mechanical contractor or GC | Cooling plant, air handling, pipework, liquid cooling | Chiller and CRAH start-up, and a liquid cooling job if possible |
| Design Manager or Engineering Manager | GC on design-build, or owner | Design integration across disciplines and consultants | How they ran design freezes and handled late changes |
Commissioning and quality
| Role | Usually sits with | Scope | What we test for |
|---|---|---|---|
| Commissioning Manager | GC or MEP contractor | Commissioning plan, test scripts, Level 1 to Level 5, turnover | The IST they led, what failed, and the fix |
| Commissioning Authority Lead | Owner or independent consultancy | Owner's project requirements, witnessing, the issues log | Whether they stop a test when they should |
| Controls and EPMS Lead | Contractor or owner | BMS, EPMS and power monitoring integration, sequences, point-to-point checks | Who owned integration on their last job, and where the boundary was drawn |
| Quality Manager | GC or owner | QA/QC plans, inspections, nonconformance reports, turnover documents | A turnover package an operations team actually used |
Site leadership
| Role | Usually sits with | Scope | What we test for |
|---|---|---|---|
| General Superintendent | GC | The whole site, the three-week lookahead, the trade foremen | Peak headcount, and the hardest logistics day they had |
| Electrical Superintendent | GC or electrical contractor | Electrical install from underground duct bank to energization | Coordination with utility field crews and gear vendors |
| Mechanical Superintendent | GC or mechanical contractor | Plant, pipework, air side, start-up | Flushing and pressure testing, then start-up with the vendors |
Preconstruction and commercial
| Role | Usually sits with | Scope | What we test for |
|---|---|---|---|
| Preconstruction Director | GC or MEP contractor | Estimating, procurement strategy, design-phase services | Whether their numbers held through construction |
| Estimating Lead, MEP | GC or MEP contractor | Takeoff and pricing for electrical and mechanical packages | Takeoffs they did themselves, from drawings |
| Project Controls Director | Owner, GC or consultancy | Schedule, cost, forecasting, change and risk across a program | Primavera P6 depth, and a rebaseline they had to defend |
| Cost Manager or Quantity Surveyor | Consultancy or owner; in the UK and Ireland, contractors too | Cost plans, valuations, change, final accounts | NEC4 or JCT experience, and data center or lab cost data |
| Commercial Director | UK or Irish contractor | Commercial strategy, contracts, claims | A final account they settled, and how |
Titles across markets
Titles drift. In the UK and Ireland a Superintendent is usually a Site Manager or an MEP Package Manager, and a US Cost Manager is a Quantity Surveyor. Some owners call their Owner's Representative a Construction Manager, which confuses everyone.
So we write briefs by scope first and title second.