Interim and contract leadership
A commissioning peak. A Project Director who resigns halfway through a phase. An owner who needs a program lead for nine months while the permanent hire works out their notice.
These are the briefs we fill on contract.
Call us when
- Someone is needed on site within a month
- The need ends at turnover
- You want to see a person work before offering a permanent job
Seats we fill on contract
Lengths are typical, not fixed. Extensions are common when a utility date moves.
| Seat | Typical length | Why it is often filled on contract |
|---|---|---|
| Commissioning Manager | 6 to 12 months | Workload climbs through Level 3 to Level 5 and drops away after turnover |
| Owner's Representative | 9 to 18 months | An owner needs eyes on one building or phase without adding permanent headcount |
| Electrical Superintendent | 6 to 12 months | Gear arrival and energization windows create a short, intense need |
| Project Controls Manager | 3 to 9 months | Rebaselining the schedule after a utility date moves, or preparing a claim |
| Program Director | 6 to 12 months | Cover during a permanent search or a reorganization |
| Quality Manager | 4 to 9 months | Punch list, close-out and turnover documentation at the end of a phase |
| MEP Manager | 6 to 12 months | A second MEP lead when two phases overlap on the same campus |
How contractors are engaged
United States
Hourly or daily rate. The person is either paid through us on a W-2 basis or works through their own company, depending on your policy and their status. Per diem and travel are usual for people working away from home.
United Kingdom
Day rate, through the contractor's limited company or an umbrella company. Medium and large clients make the IR35 status determination themselves, so we agree the route with you before anyone is introduced.
Ireland
Day rate, usually through a limited company or an umbrella arrangement. Employment status is assessed under Irish tax rules, and we settle the engagement route at the outset.
Timing
Good contract leaders plan the end of one job before it arrives, which is why we can often have someone on site in two to three weeks.
The best of them are booked ahead. A call six weeks before you need someone gets you a wider choice than a call on the Friday before.
Contract to permanent
Some clients want to convert an interim hire once the phase is done. That is fine, and the conversion terms are written into the contract on day one so nobody is surprised later. Email shannon@maulegrouphq.com with the dates and the scope.